IBM Partner Pavilion DS4100 Benutzerhandbuch

Seite von 180
CAUTION:
 
Use
 
safe
 
practices
 
when
 
lifting.
 
3.
   
Remove
 
the
 
DS4100
 
from
 
its
 
shipping
 
container
 
and
 
check
 
the
 
contents
 
(see
 
 
If
 
any
 
items
 
are
 
missing,
 
contact
 
your
 
IBM
 
reseller
 
before
 
proceeding.
 
4.
   
Assemble
 
the
 
tools
 
and
 
equipment
 
that
 
you
 
will
 
need
 
for
 
installation.
 
These
 
might
 
include:
 
v
   
The
 
power
 
cords
 
that
 
are
 
shipped
 
with
 
the
 
DS4100
 
v
   
Number
 
2
 
Phillips
 
and
 
medium
 
flat-blade
 
screwdrivers
 
v
   
Antistatic
 
protection
 
(such
 
as
 
a
 
grounding
 
wrist
 
strap)
 
v
   
Fibre
 
channel
 
and
 
Ethernet
 
interface
 
cables
 
and
 
cable
 
straps
 
v
   
SFP
 
modules
 
v
   
The
 
rack-mounting
 
hardware
 
that
 
ships
 
with
 
the
 
DS4100
 
v
   
The
 
DS4000
 
Storage
 
Manager
 
Version
 
9.10
 
Support
 
CD,
 
which
 
includes
 
the
 
IBM
 
DS4000
 
Storage
 
Manager
 
9.1
 
software
 
and
 
DS4000
 
storage
 
server
 
controller
 
firmware
 
05.42.xx.xx.
 
You
 
use
 
this
 
software
 
to
 
configure
 
the
 
storage
 
subsystems.
 
For
 
the
 
latest
 
controller
 
firmware,
 
check
 
the
 
IBM
 
support
 
web
 
site
 
for
 
DS4000
 
storage
 
products.
 
5.
   
Continue
 
with
 
Preparing
 
the
 
site
 
This
 
section
 
lists
 
the
 
floor
 
space
 
requirements
 
and
 
weight
 
information
 
for
 
the
 
DS4100.
 
For
 
information
 
on
 
interface
 
cables
 
and
 
connections,
 
see
 
Floor
 
space:
 
The
 
floor
 
area
 
at
 
the
 
installation
 
site
 
must
 
provide
 
the
 
following
 
conditions:
 
v
   
Enough
 
stability
 
to
 
support
 
the
 
weight
 
of
 
the
 
fully
 
configured
 
DS4100
 
and
 
associated
 
systems
 
v
   
Sufficient
 
space
 
to
 
install
 
the
 
DS4100
Weight:
 
The
 
DS4100
 
total
 
weight
 
depends
 
on
 
the
 
number
 
of
 
DS4000
 
1.5
 
Gbps
 
SATA
 
hard
 
disk
 
drives
 
that
 
are
 
installed.
 
A
 
fully
 
configured
 
DS4100
 
with
 
two
 
fans,
 
two
 
power
 
supplies,
 
two
 
RAID
 
controllers,
 
and
 
up
 
to
 
14
 
SATA
 
hard
 
disk
 
drives
 
installed
 
weighs
 
40.8
 
kg
 
(85.7
 
lbs).
 
Continue
 
with
 
Preparing
 
the
 
rack
 
cabinet
 
Important:
 
Before
 
you
 
install
 
the
 
DS4100
 
in
 
a
 
rack
 
cabinet,
 
keep
 
in
 
mind
 
the
 
following
 
considerations:
 
v
   
Review
 
the
 
documentation
 
that
 
comes
 
with
 
your
 
rack
 
cabinet
 
for
 
safety
 
and
 
cabling
 
considerations.
 
v
   
Install
 
the
 
DS4100
 
in
 
a
 
recommended
 
22°
 
C
 
(72°
 
F)
 
environment.
 
v
   
To
 
ensure
 
proper
 
airflow,
 
do
 
not
 
block
 
the
 
air
 
vents;
 
15
 
cm
 
(6
 
in.)
 
of
 
air
 
space
 
is
 
sufficient.
 
v
   
To
 
ensure
 
rack
 
stability,
 
load
 
the
 
rack
 
cabinet
 
starting
 
at
 
the
 
bottom.
 
v
   
If
 
you
 
install
 
multiple
 
components
 
in
 
the
 
rack
 
cabinet,
 
do
 
not
 
overload
 
the
 
power
 
outlets.
 
 
 
Chapter
 
2.
 
Installing
 
the
 
storage
 
server
 
19