HP Performance Optimized Data Center (POD) 40cp Benutzerhandbuch

Seite von 63
 
Building management system  42 
 
Alarm Meaning 
Solution 
Fan failure 
One of the fans is not working. 
If you are still within your service 
contract, contact HP service. 
Sensor failure 
One of the sensors is not working. 
If you are still within your service 
contract, contact HP service. 
Leak detection 
The drain tray senses water. 
Turn off the water flowing into your HP 
POD at the facility line. Turn off all IT 
components, so that the components do 
not overheat. If you are still within your 
service contract, contact HP service. 
Change filter* 
The return air filters are full. 
Replace the return air filters. 
High temperature 
The cold aisle temperature has 
surpassed the set point temperature. 
Check to make sure that you have 
water flowing into your HP POD and 
that the fans are blowing. If you are still 
within your service contract, contact HP 
service. 
Low temperature 
The cold aisle temperature is too low.  Check you HP POD components to 
make sure all components are 
operating as normal. If you are still 
within your service contract, contact HP 
service. 
EPO 
Someone has activated the EPO 
system and shut down the HP POD. 
Follow emergency procedures. 
After the emergency is cleared, reset 
the EPO and other HP POD systems. 
 
*The change filter alarm is only relayed to your BMS if you have the optional filter replacement sensor installed. 
 
Safety and security alarms 
Alarms pertaining to the safety of the HP POD are (optionally) relayed through your building fire and 
security dispatch. 
  
Alarm Meaning 
Solution 
Fire alarm* 
A fire has been detected in the HP 
POD. 
Activate the EPO. Follow emergency 
procedures for your facility. 
Security alarm 
(optional) 
There has been a security breach. 
Follow emergency procedures for your facility.
EPO 
Someone has activated the EPO 
system and shut down the HP POD. 
Follow emergency procedures for your facility.
 
*The fire alarm is only relayed to your building fire and security dispatch if you have connected your facility to the 
fire alarm panel. 
 
Fire alarm sequence of operations 
If a fire alarm or manual pull station is activated, the HP POD follows this sequence of operations. 
1. 
The HP POD sends an alarm signal to the building fire and security dispatch.  
2. 
The AC unit shuts down. 
3. 
The HP POD security lights flash and the horns sound the 30-second evacuation alarm.