Step 10: Create a Dsplay Dsconnecton  
E-mal 
To set a display disconnected e-mail alert, do the following:
1
Click the Monitor tab in the Global Configurator window. 
2
Click the Add Monitor button below the Monitored 
Conditions 
window.  The Monitored Conditions Wizard 
window appears.
3
Enter a name (Disconnected) in the Enter Monitored 
Condition Name
 field area.  The label now appears in the 
left pane. 
4
Click Next to specify a condition.
5
Select the desired equipment (for our purposes, choose the 
Epson PowerLite 7700p
) from the Subject Port window 
and Connection Status: Disconnected from Available 
Options
.
6
Click Apply Condition, then click Next
7
Click Next again to add an e-mail notification.
8
Highlight the appropriate e-mail message (Disconnect 
Notification
) and contacts (e-mail recipient(s)), and click 
Apply Email/Contacts
.
9
Click Done.  The dialog box closes.
Step 11: Buld and Upload a Configuraton
The Global Configurator project file contains all the 
configuration data (port assignments, product/device locations, 
scheduling data, etc.) you have created in Global Configurator.  
This is the data used to build the project's GlobalViewer Web 
pages for the MLC 104 IP Plus.  
Buldng a configuraton
To build a configuration, do the following:
1
Click the GlobalViewer tab at the left window to open 
GlobalViewer Designer. 
2
Confirm that all configured products have been given a 
location.  If not, drag each product to the desired location 
or create new ones.
3.
 
Save your project file.  If a project file has not been 
saved, GC prompts you to do so before building the 
configuration.
4
From the Build menu, choose Build All Configurations or 
Build Changed Configurations
.
The Build menu
 
An activity bar appears, indicating that the build is 
progressing.  The Upload Manager dialog appears when 
the build is complete.  
Uploadng a configuraton
The process of uploading your project is essential to successfully 
configuring the MLC 104 IP Plus and creating a GlobalViewer 
Web page.  You can upload the project to one MLC at a time or 
several at once. 
N
  You can configure devices offline, but the device must be 
connected to the network for a successful upload.
The Upload Manager appears only after a build has been 
successfully performed on at least one device.  If errors occur 
during the build of any devices, a dialog box appears listing the 
errors. 
The Upload Manager window before file upload