AMANO HandPunch 1000 Installationsanweisungen

Seite von 56
HandPunch 1000 Installation and Operation Manual
Revision 1.2
Page 11
2.0
Planning an Installation
2.1
Site Preparation
Before you begin installation, check the site blueprints, riser diagrams, and 
specifications for important information about HandPunch location and for other 
systems that connect to the HandPunch. Look for any existing wall preparations and 
wiring that other contractors may have installed for the HandPunch. A wire routing 
layout diagram (see Figure 3-2 on page 17) is provided to assist in planning wire 
routing.
2.2
HandPunch Placement
The recommended height for the HandPunch platen is 40 inches
1
 (102 cm) from the 
finished floor. The HandPunch should be out of the path of pedestrian and vehicular 
traffic, and convenient to the door it is controlling. Avoid placing the HandPunch 
where users must cross the swing path of the door. The HandPunch should be in an 
area where it is not exposed to excessive airborne dust, direct sunlight, water, or 
chemicals.
Figure 2-1: HandPunch Placement Rules
For the following sections, Recognition Systems does not supply hardware items such 
as power or communications wiring.
1. This height conforms to ADA standards.
40 in. (102 cm.)
NOTE