Bosch DKE 63 Benutzerhandbuch

Seite von 16
24
Installation 
0
8. Insert the other 4 screws with washers.

Before the 4 screws are tightened
down, align the extractor hood properly.
0
9. Connect up the air outlet pipe.
10. Connect the hood to the electricity
supply.
13. Position the lower flue duct on the
extractor hood and screw the extractor
hood to the flue duct from below with 
2 long screws.

To prevent scratching the upper 
duct when pushing on the lower duct, 
cover the edge of the lower duct with 
the installation template or other 
protective material.
Then screw the flue duct to the sides of
the fixing bracket with 2 short screws. 

Before tightening the 2 screws, 
align the flue duct.
14. Re-insert the grease filter
(see operating instructions).
1.
2.
11. Stainless steel model:
❑ Remove the protective film from the
two flue ducts.

Avoid damage to the sensitive
surface.
12. Screw the upper flue duct to the sides
of the fixing bracket with 2 short 
screws.