Barco Projector 26-0313000-00 Benutzerhandbuch

Seite von 432
84
Encore Presentation System  •  User’s Guide  •  Rev 04
3.  Hardware Installation
Installation
táÇÉ=pÅêÉÉå=pí~Åâ=`çåÑáÖìê~íáçå
The figure below illustrates a block diagram of a wide screen “stack” configuration.  Aux 
destinations are not shown.  Use this diagram for reference in the following procedure.
Figure 3-8.  Block Diagram, Wide Screen Stack Configuration
For this procedure, you will need:  
Projector #1
Projector #2
Program #1
Program #2
Preview #1
Preview #2
Ethernet Switch
To: 
Routers
ScreenPRO-II
PresentationPRO-II
ImagePRO
Program Link
Source Link
Scaled Sources 7 - 12
Scaled Sources 1 - 6
Unscaled Sources 
(Backgrounds) 3A, 3B
PG 2
PVW
PG 1
M/E Inputs
VP #2  (ID #2)
VP #1  (ID #1)
PG 2 (DVI)
PVW (DVI)
Background (BG) Input 3B
Background (BG) Input 3A
Unscaled Srcs (DSK) 1A, 1B
Bottom
Stack
#1
Top
Stack
#1
PG 2
PVW
PG 1
M/E Inputs
VP or VPx #4  (ID #4)
VP or VPx #3  (ID #3)
PG 2 (DVI)
PVW (DVI)
BG Input 3B
BG Input 3A
Bottom
Stack
#2
Top
Stack
#2
Program Link
Source Link
(Backgrounds) 
3A, 3B
(DSK) 1A, 1B
Note:   #1 is VP only
Note:   #2 is VP only
Controller SC or LC
Table 3-7.  Equipment List,  Wide Screen Stack Configuration  
Qty.
Item
Note
2
VP
Master units (ID#1 and ID#2) must be VP, not VPx.
2
VP or VPx
The ID of the bottom stack processor must always be lower than the ID 
of the top stack processor.   Use 6 total processors for triple wide 
screen, use 8 for quadruple wide, etc.
1
Controller
Model SC or LC
2
Video Projectors
Customer supplied   
4
DVI or Analog Monitors
Program and Preview (customer supplied)