Brocade Communications Systems Brocade Mobility Controller RFS6000 Benutzerhandbuch

Seite von 36
Site preparation
1
Brocade Mobility RFS6000 Controller Installation Guide
3
53-1001573-03
Site preparation
Consult your site survey and network analysis reports to determine specific 
equipment placement, port capacity, power drops, and so on. 
Assign installation responsibility to the appropriate personnel.
Identify where all installed components are located.
Verify appropriate rack mounting requirements.
Provide a sufficient number of power drops for your equipment.
Ensure adequate, dust-free ventilation to all installed equipment.
Identify and prepare Ethernet and console port connections.
Verify that cable lengths are within the maximum allowable distances for 
optimal signal transmission.
Verify that the Mobility RFS6000 Controller is powered through an 
Uninterruptible Power Supply (UPS).