EQUIPMENT  LOADING 
 
Lower the Deck 
NOTE:  Trailer must be hitched to vehicle according to page 4 before lowering or raising the deck. 
1.  Turn power switch to ON position. 
 
2.  Hold toggle switch in DOWN position. Lift 
latch handle and push handle back. 
 
NOTE:  The trailer frame should be on a level 
surface when lowering the deck. 
 
 
 
 
 
Load the Equipment 
 
 
1.  Load equipment so that the resulting tongue 
weight is 15 to 20% of the total load. 
 
2.  Install tie-down straps to keep the load from 
shifting. Use tie-down anchors shown. 
 
 
 
Maximum capacity = 4000 lbs. Do not exceed. 
 
Always secure the load with tie-down straps 
before towing. Failure to properly secure the 
load may result in injury, death, or equipment 
damage. 
 
 
 
 
Do not hook tie-down straps on the roller 
guides.