Schwinn 420 Benutzerhandbuch

Seite von 20
Assembly
Parts 
•  Main Unit (from Step 3)
•  #19 - Console (Qty. 1)
•  #20 - Static Handlebar (Qty. 1)
Hardware
•  #24 - M8 Flat Washer (Qty. 4)
•  #25 - M8 Lock Washer (Qty. 4) 
•  #30 - M8x20 Hex Screw (Qty. 4)
•  Pre-installed Screws in Back of Console (Qty. 4)
Tools
•   Phillips Head Screwdriver
4-1  Feed the Heart Rate Wire (W3) from the Static Handlebar 
through the rectangular opening in the handlebar.
4-2  Put the Console Mast Wire (W2) through the rectangular 
opening in the Static Handlebar. The Heart Rate Wire 
goes through the notch (N) in the Console Mast. Connect 
the Static Handlebar to the Console Mast with the 
hardware shown.
NOTICE:   Do not pinch the wires when putting the 
Static Handlebar on the Console Mast.
4-3  Remove the 4 pre-installed screws (S) in the back of the 
Console. Save them for Step 4-5.
4-4  Connect the Console Wire (W4) to the Console Mast 
Wire (W2). Connect the Heart Rate Wire to the Heart 
Rate connector (W5) from the back of the Console. 
4-5   Attach the Console
 
to the Static Handlebar assembly 
with the screws from Step 4-3.
NOTICE:   Do not pinch the wires when putting the 
Console on the Static Handlebar.
Step 4:  Install Static Handlebar and Console
20
19
30
25
24
S
W5
W3
W2
W4
N
Assembly Manual
11