Utica Boilers UB95M-200 Installationsanweisungen

Seite von 2
 
2201 Dwyer Ave. 
● P.O. Box 4729  ● Utica, NY 13504-4729 ● Ph: 315-797-1310 ● Fax: 315-797-3762 ● E-Mail: info@ecrinternational.com ● Web: www.ecrinternational.com
 
 
BULLETIN NO. 090507 
 
DATE:
 
05/07/09 
    
 
PRODUCT: All 95M-200 Boilers   
 
FROM: Technical Service Department 
 
TITLE: 
Line Voltage Monitor
 
 
MODELS AFFECTED 
 
95M-200 
 
 
SITUATION 
 
There have been reported incidents regarding E-04 lockouts on the 95M-200 boilers due to low voltage or 
“brownout” conditions. An E-04 error code is intended to indicate that there has been a hard lockout followed by a 
loss of power. For example:  
 
•  On a call for heat the boiler fails to ignite. The boiler will lockout and display the E-02 error code. 
•  Then, while locked out, there is a power loss. Upon power being restored, E-04 is now displayed and the 
control remains in a hard lockout. This alerts you that a hard lockout error occurred prior to the power loss.  
 
Low voltage conditions can cause the Honeywell MCBA boiler control to lockout and display an erroneous E-04 
code. These reports have been limited to certain applications and are not widespread.  
 
 
SOLUTION:  
 
A “Line Voltage Monitoring” control has been developed to insure that the Honeywell MCBA operates only under full 
power.
 
The operation of this line monitoring device is to insure that proper power is supplied to the Honeywell MCBA 
control. In the event the incoming power approaches unacceptably low levels, the line monitor will shut down power 
to the control preventing operation and preventing an E-04 hard lockout.  
 
Production models:
 
Starting with boilers manufactured May 1, 2009, the Line Voltage Monitor is installed as standard equipment, See 
photos 1 & 2.   
 
 
 
Technical
 Bulletin