Siemens TV Converter Box 611 Benutzerhandbuch

Seite von 324
 
Commissioning 
 
9.2 Procedure 
 
CAUTION 
 
It is essential that the following checks are carried out before the pulse and controller 
enables are activated: 
Make sure that the encoder parameters have been assigned correctly, particularly if the 
speed actual value needs to be inverted. 
Rotate the motor manually to check that the speed actual value has the correct sign and 
that the position actual value is incremented or decremented accordingly. 
Please note that parameters also have to be assigned for the speed actual value inversion 
on the NCK side (axis-specific machine data, MD 32110 – ENC_FEEDBACK_POL[0] = –1).
When initially testing the motion-based process of rotor position identification, you should 
reduce the current for safety reasons to 10%, for example (MD 1105 = 10%). The current 
reduction does not have any effect on the process; it only becomes active once 
identification is complete. 
 
1FW6 Built-in torque motors 
Configuration Manual, 05/2009, 6SN1197-0AD00-0BP7 
171