Trane Integral Air Cooled 5 to 15 Tons Wartungshandbuch

Seite von 24
SXIJ-SVX01B-EN
7
Installation
Pre-Installation Considerations
Checklist
The following checklist gives an overview of the
recommended pre-installation considerations. Follow the
procedures in this section to ensure installation is
complete and adequate for proper unit operation. Verify
this checklist is complete before beginning unit
installation.
Verify the unit size and tagging with the unit nameplate
to ensure the correct unit is received.
Inspect the unit for possible shipping damage and
make any necessary claims with the freight delivery
company immediately.
Before installing the unit, remember to allow
minimum recommended clearances for routine
maintenance and service. Refer to unit dimensions and
clearances on submittals or in the
Verify the unit is configured properly prior to beginning
unit installation.
Make proper acoustic considerations before installing
unit. Do not install unit near sound-sensitive locations.
Allow adequate space for service and operating
clearances. Reference
section on
this page.
Make provisions for correct supply power and note
electrical connection knockouts locations on the unit
submittals or in the
section.
Ensure the unit installation location is level.
Receiving and Handling
Shipping Package
Integral air-cooled units ship assembled on skids. Units
ship in the unitary configuration, assembled, piped, and
charged with refrigerant.
Receiving Checklist
Complete the following checklist immediately after
receiving unit shipment to detect possible shipping
damage.
Verify that the unit nameplate data corresponds to the
sales order and bill of lading (including electrical data).
Visually inspect the unit exterior for physical signs of
shipping damage or material shortages.
If a unit appears damaged, inspect it immediately
before accepting the shipment. Remove access panels
and check for interior component damage. Make
specific notations concerning the damage on the
freight bill. Do not refuse delivery.
Report concealed damage to the freight line within the
allotted time after delivery. Verify with the carrier their
allotted time to submit a claim.
Note: Failure to follow these procedures may result in no
reimbursement for damages from the freight
company.
Do not move damaged material from the receiving
location. It is the receiver's responsibility to provide
reasonable evidence that concealed damage did not
occur after delivery.
Do not continue unpacking the shipment if it appears
damaged. Retain all packaging. Take photos of
damaged material if possible.
Notify the carrier's terminal of the damage
immediately by phone and mail. Request an
immediate joint inspection of the damage by the
carrier and consignee.
Notify your Trane representative of the damage and
arrange for repair. Have the carrier inspect the damage
before making any repairs to the unit.
Unit Storage
Take precautions to prevent condensate from forming
inside the unit's electrical compartments and motors if the
unit is stored before it is installed.
Service Access
Maintain adequate clearances around and above the unit
to ensure proper unit operation and allow sufficient
service access. Trane recommends 36-inches service
access on all sides of the unit.
Acoustic Considerations
Before determining the final unit installation site,
remember that proper unit placement is critical in
reducing transmitting sound levels to the building. The
ideal time to make provisions to reduce sound
transmissions is during the design phase. The most
economical means of avoiding a potential acoustical
problem is to place units in areas that are not acoustically
sensitive.
WARNING
Hazardous Voltage!
Disconnect all electric power, including remote
disconnects before servicing. Follow proper lockout/
tagout procedures to ensure the power can not be
inadvertently energized. Failure to disconnect power
before servicing could result in death or serious injury.