Utica Boilers UB95M-200 Servicehandbuch

Seite von 2
!  
!  
SUPPLEMENT
AL
 INSTRUCTIONS
NATURAL GAS TO LP AND LP TO NATURAL GAS
 CONVERSION INSTRUCTIONS FOR GAS-FIRED
DIRECT VENT MODULATING HOT WATER BOILERS
 P/N 240005545, Rev. 1.1 [04/06]
!  
!  
WARNING
THIS CONVERSION KIT SHALL BE INSTALLED BY A QUALIFIED SERVICE AGENCY IN 
ACCORDANCE WITH THE MANUFACTURER’S INSTRUCTIONS AND ALL APPLICABLE 
CODES AND  REQUIREMENTS  OF  THE AUTHORITY  HAVING  JURISDICTION.  IF  THE 
INFORMATION IN THESE INSTRUCTIONS IS NOT FOLLOWED EXACTLY, A FIRE, AN 
EXPLOSION,  OR  PRODUCTION  OF  CARBON  MONOXIDE  MAY  RESULT,  CAUSING 
PROPERTY  DAMAGE,  PERSONAL  INJURY,  OR  LOSS  OF  LIFE.  THE  QUALIFIED 
SERVICE AGENCY IS RESPONSIBLE FOR THE PROPER INSTALLATION OF THIS KIT. 
THE INSTALLATION IS NOT PROPER AND COMPLETE UNTIL THE OPERATION OF THE 
CONVERTED APPLIANCE  IS  CHECKED AS  SPECIFIED  IN  THE  MANUFACTURER’S 
INSTRUCTIONS SUPPLIED WITH THE KIT.
CAUTION
Before proceeding with this conversion, the gas supply should be shut off prior to disconnecting electrical 
power.
CONVERTING A BOILER FROM NATURAL GAS TO LP
1. Remove the front service panel from the boiler.
2. Turn the ½” ball valve to the “off” position.
3. Disconnect the gas supply piping from combination gas valve.
4. Disconnect the Venturi manifold from the gas valve.
5. Insert the 7.0mm LP orifice (P/N# 1350023) as shown on next page.
6. Connect the Venturi manifold to the gas valve.
7. Connect the gas supply piping to the combustion gas valve.
8. Turn the ½” ball valve to the “on” position.
9. Replace the front service panel.
10. Place “Propane” and “Conversion” labels on jacket next to the rating plate.
11. Follow the instructions under “Checkout Procedures and Adjustments” in the separate “Control Manual 
and Operating Instructions” (P/N# 240006104) to set the unit on rate.