Fujitsu Primecenter M1 BS2000 Benutzerhandbuch

Seite von 117
92
 
 
 
Power Distribution
©
 c
o
g
n
it
as
. Ges
e
lls
c
h
ft
 f
ü
r T
e
c
hni
k
-D
o
k
u
m
e
n
tat
ion m
b
H 20
11 
P
fa
d
O
:\
F
T
S
\P
RI
M
E
R
G
Y
-HW
\R
a
c
k
\P
C
R
-M
1
-R
ac
k
\M
anua
ls
\U
s
e
r M
anu
al
\0
2
_
wo
rk
\pc
r-
m
1
-r
ac
k
-u
m
-en
\pc
rm
1-
rac
k
-u
m
-e
n
.k
0
7
7.3.5.3
Installation options for 600 mm wide symmetrical racks
Performing the task
Ê
Install the socket strips onto the PDU kit 3 HU as described on 
.
Figure 59: Single-phase 8-way 10 A socket strip mounted in a 600 mm wide symmetrical rack
Ê
Install the PDU kit 3 HU into the rack on the desired height.
I
The PDU kit 3 HU has to be installed from HU 7 upwards.
Rack height
Installation direction vertically 
Installation direction horizontally 
42 HU
Not possible
Max. 4x with PDU kit 3 HU
24 HU
Not possible
Max. 4x with PDU kit 3 HU
16 HU
Not possible
Max. 4x with PDU kit 3 HU
Table 15: Installation options for 600 mm wide symmetrical racks