Figure e:  Internal Wiring Harness Components - Install Protective Edging
Install 1-13/16” lg. pieces on horizontal raw edges
at both ends of chaseway channel assembly. Install
4-11/16” lg. pieces to vertical chaseway channel
flanges inside primary junction box as shown in 
Figure 24e.
5.  Locate and install internal control/safety circuit
wiring harness. Start with harness end that has three
(3) connectors, insert connectors through rectangular
opening on front and rear of primary junction box.
Pull harness through J-box until second set of three
(3) connectors can be inserted through front opening
in J-box. Center connectors in primary J-box and
secure harness to chaseway using nylon wire tie No.
1, see Figure 24f.
Note:  if sage Boiler control (sBc) is to be used 
with boiler, refer to installation section of sage 
Boiler control instruction Manual (located in 
sage Boiler control Parts carton) at this time.  
Review installation section of sBc manual in its 
entirety and keep on hand during assembly of 
boiler.  installation of sBc sensors and wiring 
is much easier when it is done in parallel with 
installation of MPc internal wiring harness and 
jacket panels.
Pull on harness to remove slack in J-box, secure
harness to end of chaseway channel using wire tie
No. 2 as shown in Figure 24f.
Figure f:  Internal Wiring Harness Components - Install and Secure Harness to Chaseway