Burnham FM01FD00B Benutzerhandbuch

Seite von 108
8
TABLE OF CONTENTS
SECTION  I  -  GENERAL  INFORMATION
 
Dimensional Information .................................................................................................................  10
 
Ratings/Data ....................................................................................................................................... 1
 
Locating the Unit . ............................................................................................................................. 1
 
Air Supply/Venting ............................................................................................................................. 1
SECTION  II  -  CAST  IRON  BLOCK  ASSEMBLY INSTRUCTIONS  (Knockdown Boiler)
 
Knockdown Boiler w/ Factory Assembled Section ........................................................................ 17
 
Assembly of Sections, Manual Draw-up  ........................................................................................ 18 
 
Assembly of Sections, Hydraulic Draw-up  .................................................................................... 
 
Hydrostatic Test  ................................................................................................................................ 
SECTION  III  -  BOILER  ASSEMBLY  INSTRUCTIONS (Knockdown Boiler)
 
Install Common Parts to Block (Hinge Hardware, Flue Collector, Clean-out Covers, Etc.)  ...... 5
 
Install Supply and Return Manifolds  .............................................................................................. 7
 
Install Return Water Mixing Tube ..................................................................................................... 7
 
Install Jacket Support Frame to Block ............................................................................................ 0
 
Install Heat Exchanger Insulation .................................................................................................... 7
 
Install Internal Wiring Harness Components  ................................................................................. 8
 
Install Jacket Top Corner Panels  .................................................................................................... 
 
Install Jacket Front and Rear Panels  .............................................................................................. 
 
Install Jacket Top and Side Panels . ................................................................................................ 5
 
Install Burner Swing Door (BSD)  .................................................................................................... 7
 
Install 
nd
 and 
rd
 Pass Flueway Baffles........................................................................................... 9
 
Procedure to Close and Secure Burner Swing Door ..................................................................... 50
 
Install Burner Adapter Plate and Mount Burner (Burner Specific) ............................................... 50
 
Connecting Internal Wiring Harness to Burner Controls .............................................................. 51
 
Install Standard Water Trim and Control ......................................................................................... 5
 
Install Optional Controls:
 
 
•  Probe LWCO ............................................................................................................................. 5
•  High Limit Control w/ Manual Reset ...................................................................................... 5
 
 
•  Low Fire Hold Control ............................................................................................................. 5
•  Low / High / Low Control or Modulating Control .................................................................. 55
 
Install Flue Outlet Damper Assembly .............................................................................................. 56
 
Install Optional Burner Swing Door Cover Split Jacket Panels .................................................... 57
SECTION  IV  -  INSTALLATION  INSTRUCTIONS
 
Packaged Boiler - Shipping Information ......................................................................................... 58
 
Boiler Piping - Heating Applications................................................................................................ 58
 
Boiler Piping - Domestic Hot Water ................................................................................................. 6
 
Relief Valve Piping ............................................................................................................................. 6
 
Electric Wiring ................................................................................................................................... 6
SECTION  V  -  OPERATING  INSTRUCTIONS
 
Filling System .................................................................................................................................... 65
 
Adjusting Controls ............................................................................................................................ 65
 
Adjusting Burner ............................................................................................................................... 65
 
Test Controls ...................................................................................................................................... 66
 
Initial Cleaning, Water Boilers .......................................................................................................... 66
 
Frequent Water Addition ...................................................................................................................67
 
Oxygen Corrosion ............................................................................................................................. 67