Zephyr AK1124S Handbuch
www.zephyronline.com
8
Installation -
P
reparing Electrical and Ducting
2. Remove cover from junction box to gain
access to the electrical wiring.
access to the electrical wiring.
1. Remove filters.
4. If using hood in air recirculation mode,
skip steps 4 and 5 pry open the desired
3 1/4” x 10 ducting knockout, either
horizontal or vertical.
skip steps 4 and 5 pry open the desired
3 1/4” x 10 ducting knockout, either
horizontal or vertical.
3. If using a cable lock (not provided) pry
open the desired electrical knockout, either
on the top or the back. Feed the wires
through the 3/4” cable lock. Note: Some
local coded require the use of a cable lock,
check your local coded for this information.
open the desired electrical knockout, either
on the top or the back. Feed the wires
through the 3/4” cable lock. Note: Some
local coded require the use of a cable lock,
check your local coded for this information.
5. Attach the 3 1/4” X 10 starting collar
with damper to the duct opening you
exposed.
with damper to the duct opening you
exposed.
Front
Rear
Cable lock
Wall
7"
9"
9 1/2"
8"
(min.cutout)
Duct Measurements
Cable lock example