Maytag MDE18PDAYW Installationsanweisungen

Seite von 60
17
INSTALLING LEVELING LEGS, COIN SLIDE, AND COIN BOX
On some models: The console houses the electronic control 
board. The board is factory set for a dry time of 45 minutes. 
Consult the tech sheet found inside the dryer toe panel to reset dry 
time and for other options.
The card reading mechanism is not included, but is available from 
your usual industry sources.
1.  Prepare dryer for leveling legs
NOTE: Slide dryer onto cardboard or hardboard before moving  
to avoid damaging floor covering. 
Using two or more people, move dryer to desired installation 
location. 
Take tape off front corners of dryer. Open dryer and remove  
the literature and parts packages. Wipe drum interior with a damp 
cloth to remove any dust. 
Take two cardboard corners from the dryer carton and place them 
on the floor in back of the dryer. Firmly grasp the body of the dryer 
and gently lay it on its back on the cardboard corners. Disconnect 
power before making electrical connections.
2.  Screw in leveling legs 
Examine leveling legs and find diamond  
marking. Screw legs into leg holes by  
hand. Use an adjustable wrench or  
1" (25 mm) hex-head socket wrench  
to finish turning legs until diamond  
marking is no longer visible. Then fit  
a covered foot boot over each leg foot.
To protect the floor, use a large piece of cardboard from the dryer 
carton. Stand dryer up on the cardboard. Slide the dryer until 
it is close to its final location. Leave enough room for electrical 
connection and to connect the exhaust vent.
Foot
Diamond 
Marking
(appearance may vary)
1.  Install coin slide and coin box
Remove the service door of the meter case by lifting it up at the 
back. Install the money-accepting device. (Refer to manufacturer’s 
instructions for proper installation.)
For dryers using coin slides, use the adapter kit supplied with the 
dryer.
Replace the meter case service door. Put the coin vault with lock 
and key in the meter case opening.
Remove cardboard or hardboard from under dryer. Adjust the legs 
of the dryer up or down until the dryer is level.
2.  Install added security device
Check that power is not supplied to the dryer.
Open and remove the service door.
Insert the narrow part of the security cone into the oblong hole in 
the bottom rear of the meter case assembly.
Pass the security bolt through this cone and thread it by hand into 
the cage nut below the oblong hole.
Tighten the security bolt by hand a few turns before using a wrench 
to tighten until snug.
security 
bolt
security 
cone
cage nut
NOTE: Installing the security bolt provides added security, but  
will add to the service time when the top needs to be removed  
for servicing the dryer.
Security 
Bolt
Security 
Cone
Cage 
Nut
On some models: The meter case houses the factory-installed 
accumulator timer with actuating arm or service switch.
The factory-installed timer is set to provide 45 minutes (4 pins) 
of drying time when activated by the coin slide. Timer cams 
for 30-minute (6 pins) and 60-minute (3 pins) drying times are 
included in the parts bag.
The coin slide mechanism, service door lock and key, and coin box 
lock and key may not be included but are available from the usual 
industry sources.