Vent-a-Hood PRH18M60SS Installationsanweisungen

Seite von 6
Page 3
L157 0311A

Electrical


10" Round
Centerline
of Hood
6" Round

Electrical

Centerline
of Hood
Installation Details
1)  Read all instructions thoroughly before beginning installation. Note: These instructions apply to standard hoods only. 
Custom hoods may require additional specification consideration.
2)  When installing a wall mount range hood, it is recommended that the bottom edge of the hood be located no more 
than 30” above the cooking surface. Exceeding recommended mounting height may compromise performance.
3)  Consult the connection diagrams below for further details on exhaust outlet placement.
 
Install the duct from the outside of the home down to the exhaust outlet on the hood. The end of the duct should extend 
to the top of the hood for the M600 blower or 1" past the top of the transition for the M1200 blower.
 
Use duct tape to seal all joints. A complete listing of available Vent-A-Hood ducting materials is included on the back 
page of this instruction sheet.
 
Transition heights are as follows:
Single Blower (M600): 
6” round duct will connect directly to the top of the hood.
Dual Blower (M1200): 
Included 10” round transition (VP566) is 9”  tall.
M1200 Connection Diagram
Dual Blower
(Top View)
Single Blower
(Top View)
M600 Connection Diagram