Broan RP130 Installationsanweisungen

Seite von 16
ap1 & Rp SeRieS
Page 
3¼” X 10” 
HoRizontaL Ducting
CABINET
BOTTOM
CABINET FRONT
HORIZONTAL DUCT
ACCESS HOLE
6¼"
6¼"
3/4
"
HOOD
MOUNTING
SCREWS (4)
ELECTRICAL
ACCESS HOLE
(in wall)
3
7/8
"
CENTER
LINE
WOOD SHIMS
(recessed-bottom
cabinets only)
15¼" 
(36" hood)
12¼" 
(30" hood)
15¼" 
(36" hood)
12¼" 
(30" hood)
7
1/2
"
1/8
"
pRepaRe tHe HooD
4
Blower is shipped in Vertical Discharge position.
To change blower to
Horizontal Discharge position:
Remove
Knurled  nuts  from  Blower  mounting  Rods.
Disengage mounting rods from blower and rotate blower
to  horizontal  discharge  position.  Re-engage  mounting 
rods and tighten blower in place with knurled nuts.
3
Remove  the
aluminum  Filters,  Bottom  cover,  and
wiring cover from the hood.
9"
CENTER
LINE
HOOD MOUNTING SCREWS (4)
ELECTRICAL
ACCESS HOLE
(in cabinet bottom)
WOOD SHIMS
(recessed-bottom
cabinets only)
CABINET FRONT
CABINET
BOTTOM
15¼" 
(36" hood)
15¼" 
(36" hood)
12¼" 
(30" hood)
12¼" 
(30" hood)
1
1/2
"
7
1/2
"
VERTICAL DUCT
ACCESS HOLE
6¼"
6¼"
10
5/8
"
6
7/8
"
9
7/8
"
3¼” X 10” 
VeRticaL Ducting
2
Use the proper diagram below, for placement of ductwork
and electrical cutout in cabinet or wall. For a non-ducted
installation, DO NOT cut a duct access hole.
ALUMINUM
FILTERS
BOTTOM
COVER
WIRING
COVER
VERTICAL DISCHARGE POSITION
HORIzONTAL DISCHARGE POSITION
BLOWER
MOUNTING
ROD (2)
KNURLED NUT (2)
BLOWER
MOUNTING
ROD (2)
KNURLED NUT (2)
BLOWER
BLOWER