Thermador PH48HS Installationsanweisungen

Seite von 48
English 9
3. For horizontal discharge, use Figure 6 for the geometry 
of the cutout required for clearance of the transition.
4. Hang hood from screws and tighten securely.
5. From inside of hood, insert screws supplied. Drill 
through holes (use #8 x 5/8" screws supplied), one (1) 
on each side and four along the front, into bottom of the 
cabinet. See screw holes labeled "L" in Figure 11. 
Centerline Hole Dimensions for Figures 11 and 12
Installing an Integral Blower, 
Model VTN630C or VTN1030C
The hood can be installed with a model VTN630C or 
VTN1030C integral blower.
Blower Preparation
1. Remove left and right shipping brackets and discard.
2. Cut wire tie shown in Figure 13. Locate the wire 
harness with the Molex 6-pin connector. Route wire 
harness out rear of blower, as shown in Figure 14 
below. 
3. Re-attach wire harnesses to capacitor with new wire tie 
(supplied) in same location in front.
4. Attach wire harness with Molex 6-pin connector to 
housing as shown in Figure 14 with wire tie (supplied).
 Figure 12: Transition and Conduit Locations
HOOD
SIZE
A (Fig 11)
Tap Holes
B (Fig 12)
Conduit Holes
30”
29-1/16”
13-7/16”
36”
35-1/16”
16-7/16”
42”
41-1/16”
19-7/16”
48”
47-1/16”
22-7/16”
54”
53-1/16”
25-7/16”
23"
3-3/16"
7-7/8"
2-3/8"
Wall
B
1-1/8"
1-7/8"
2-3/8"
Cooktop
Centerline
Plan View of Cabinet Cutout
5/8" DIA clearance
holes for 1/2" conduit
to j-box.
Note: 
This figure depicts transition and conduit 
locations only. See Figure 2 on page 4 for overall 
hood dimensions.
 Figure 13: Blower Front View
 Figure 14: Blower Rear View
Shipping Brackets
Blower Front View
Capacitor
Wire tie
Wire 
Harness
Blower Rear View
Add wire 
tie here