Monogram ZV925SLSS Installationsanweisungen
12
• Align the template with the marks on the ceiling
and tape in place.
– Be sure the template is oriented correctly
– Be sure the template is oriented correctly
with the front of the hood.
• Use a plumb bob to be sure the mounting holes
will provide parallel alignment with the countertop
below.
below.
• Center punch all hole locations.
• Drill pilot holes in the 4 screw locations. Use a 3/16
• Drill pilot holes in the 4 screw locations. Use a 3/16
″
bit and drill approximately 1-1/2
″ deep.
• Drive 4 hex head wood screws into the center of
the ceiling joists and cross framing. Leave a 1/4
″
gap to allow the screw head to engage the keyhole
slots on the support frames.
slots on the support frames.
• Cut the 8-1/2
″ duct opening through the sheet rock.
STEP 1 MOUNT TEMPLATE
Installation Instructions
STEP 2 ADJUST FRAME HEIGHT
•Measure exact ceiling height.
•Find the exact frame height
•Find the exact frame height
required on the chart on page 6.
•Remove 2 screws on each of the
4 sides of the frame to loosen the
upper structure, lower structure
and blower/motor.
upper structure, lower structure
and blower/motor.
•Adjust the height “X”, according to
the chart on page 6. Use a total of
32 screws (8 screws on each side)
to secure the upper structure,
lower structure and blower/
motor together.
32 screws (8 screws on each side)
to secure the upper structure,
lower structure and blower/
motor together.
1/4" Gap
24
″ min.
30
″ max.
36
″ min.
Frame
height
height
2-3/4
″
Ceiling
height
X
49-80406
Printed in Italy 04-06 JR
36
″ Hood
Template
8-1/2
″ Dia.
Cut a 1
″ Dia.
Wire Access
Hole
Hole
Cut a 1
″ Dia.
Wire Access
Hole
Hole
Drill 3/16
″
Pilot Holes
Approx. 1-1/2
″
Deep
Drill 3/16
″
Pilot Holes
Approx. 1-1/2
″
Deep
10-1/16
″ to
Centerline
of Holes
7-1/16
″ to
Centerline
of Holes
FRONT OF HOOD
7-1/16
″ to
Centerline
of Holes
INSTALLATION—VENTED TO THE OUTSIDE