FiveStar TPN0487S Anwendung

Seite von 8
STEP 9
 
 
CHECKLIST FOR OPEN BURNER INSTALLATION 
 
 
MAKE SURE ALL CONTROLS ARE IN THE “OFF” POSITION. 
 
 
Gas supply is “on” 
 
 
Electric power is “on” 
 
 
Burner drip pans in position under burners 
 
 
Surface burners in position 
 
 
Burner pans in position 
 
 
Burner grates in position 
 
 
Surface burner ignition test 
 
 
Griddle/Grill burner ignition test 
 
 
Griddle/Grill assembly in position 
 
 
MAKE SURE ALL CONTROLS ARE LEFT IN THE “OFF” POSITION 
 
 
 
Date Installed & Inspected __________________________________________________ 
 
Authorized Installer’s Signature  _____________________________________________ 
 
Please Print Name  ________________________________________________________ 
 
 
NOTE: Please leave this checklist, Use & Care manual and product registration 
card with the Homeowner.