Movincool CLASSICPLUS14 Servicehandbuch

Seite von 66
Repair Section
55
9.2 Removal of Refrigeration Cycle Components
CAUTION
• Before any refrigeration cycle component can be replaced, it is necessary to recover the
refrigerant using standard recovery procedures and equipment.
• To prevent oxidation, dry nitrogen should be conducted (flow rate 0.27 gal/min (1 L/min)) through
the pinch-off tube during any brazing operation.
• During any component replacement involving brazing, shield nearby parts with a steel plate, etc.,
to protect them from the flame.
• Evaporator
• Capillary tube
• Condenser
• Compressor
< NOTE >
When replacement of the compressor, attach the two pipes (Pipe 1, Pipe 2) which are packaged
in Compressor Assy as following figure.
I002342
 
Compressor
A & E
A & B
C & D
C & E
Condenser
Capillary Tube
Evaporator
Part to Replace
Disconnect At
D
C
E
A
B