Sterling SSL Benutzerhandbuch

Seite von 66
 
23 
4-3  Starting the Hopper Loader 
1.  Insert the pickup probe into the material supply. 
2.  Turn on compressed air to the unit. 
3.  Plug in power to the control enclosure. 
4.  Move the power switch on the Series One graphic panel to the 
ON position.
 
 
 
4-4  Changing the Conveying Sequence 
 
!
 
DANGER
 
 
DISCONNECT POWER 
BEFORE
 
OPENING THE CONTROL BOX. 
 
Electric current, CAPABLE OF 
CAUSING INJURY OR DEATH
, MAY BE 
PRESENT in the controller enclosure 
during these procedures. 
 
The adjustments listed in this section 
must be performed 
ONLY
 by a qualified, 
safety-conscious technician.
 
 
 
The Series One controller is a time-fill mode controller, and has sixteen (16) loading 
sequences to select. Make sure you avoid over-filling the hopper! Figures 7 and 8 list 
loading times and number of blowback pulses in each sequence. Use the chart as your 
model;
 select a sequence that suits your needs.