SSC Series Central Chilling Stations 
9-3  Evaporator Maintenance 
The evaporator(s) may be accessed for back-flushing by removal 
of the 2” plug (approx. 51 mm) in the return control nipple and the 
flow switch in the supply control nipple. If the suggested piping 
recommendations have been followed, one circuit of a multiple 
circuit chiller may be back-flushed without shutting down the 
entire system. Check Y-strainer for any clogging. 
 
9-4  Pump Motor Seal 
Pump seals require water for lubrication, so the pump(s) must 
never be run dry. Always fill the tank before attempting to operate 
the pump(s). Seal failures usually follow a period of dry operation 
of the pump. 
 
 
9-5  Makeup Valve 
Periodically inspect the water makeup valve assembly for proper 
operation. If the valve no longer shuts off completely or reliably, 
replace it. The plastic ball float should be buoyant for proper 
operation. 
 
 
9-6  Recommended Pump Tank Spare Parts 
Part no. 
Part description 
Quantity 
A0550190 
Pressure gauge 
1 per pump 
A0102396 
Float valve, 1” (approx. 25 mm) 
1 per tank 
A0069538 
Plastic ball float, 6” (approx. 152 mm) 
1 per tank 
A0102394 
Float rod, 10” (25 cm) 
1 per tank 
- Call Sterling 
Parts - 
Pump seal and casing gasket 
1 per pump 
 
Check your Customer Information Packet for a complete list of 
spare parts and part numbers for your SSC Series chilling station.