Bunn ICB/TWIN Benutzerhandbuch

Seite von 4
  
INTRODUCTION
This instruction details installation of the transformer kit to convert a 120V (2 wire w/ground) or 120/240V (3 
wire w/ground) SINGLE or TWIN to a  208V (2 wire w/ground).
NOTE: This procedure should only be performed by a trained technician.
CONTENTS
 
ITEM  
PART NO. 
QTY.  DESCRIPTION
 1 
43218.0001 1 
Transformer/Bracket 
Assembly
 2 
02308.0000 2 
Screws
 
3a 
42995.0000 
Decal, Wiring Diagram (SINGLE)
 
3b 
42995.0001 
Decal, Wiring Diagram (TWIN)
 
4a 
42947.0000 
Wiring Harness (SINGLE Only)
 
4b 
42947.0001 
Wiring Harness (TWINS Only)
 5 
42925.0002 1 
Instructions
BUNN-O-MATIC CORPORATION
POST OFFICE BOX 3227
SPRINGFIELD, ILLINOIS 62708-3227
PHONE: (217) 529-6601    FAX: (217) 529-6644
42925.0002A   02/11   ©2011  Bunn-O-Matic Corporation
MODEL ICB/TWIN/
ITCB-DV HV/        
ITCB HV TWIN
CONTINUED
1. Make sure the unit is unplugged.
2. Remove the front panel by loosening the (6) screws. Save 
screws.
3. Remove the white and black power cord wires from the terminal 
block, and remove the ground screw.  Save ground screw.  Loosen 
the screws on the strain relief and remove & discard the 120V 
power cord.
4. Remove the red/black 2-wire harness that connects the terminal 
block to the master on/off switch. Discard harness.
5. Remove the component bracket by removing the 2 screws 
connecting the bracket to the base. Save screws.
6. Use the drill hole pattern to drill (2) holes in the base. FIG 1 
ICB, FIG 2 ITCB-DV HV
7. Mount the component bracket to the transformer bracket with 
saved screws from step 5.
FIG 1
3-wire (no neutral) transformer conversion kit instructions
Center the template between 
the support channels under the 
base plate. Mark/drill holes 
8.0
" from back of brewer.
TRANSFORMER/BRACKET INSTRUCTIONS
FIG 2
¾˝
ICB/ITCB-DV HV