Frigidaire PLHV36W6KC Benutzerhandbuch

Seite von 24
6
Installation
Installation
Installation
Installation
Installation
Appliance Installation:
Appliance Installation:
Appliance Installation:
Appliance Installation:
Appliance Installation:
11. Install transition on top of hood if removed for shipping. Figure 4.
12. Hang hood on 2 mounting hooks through the rectangular cutouts on
back of hood. Figure 5
13. Level the appliance, using a carpenters level across bottom of hood with
leveling screws in mounting hooks or rectangular cutouts.
14. Secure hood with 2 screws on top and 2 screws on bottom.  See Figure 5.
15. Connect ducting (Figure 4).
Note: for blower serviceability, leave a gap of 1" minimum between top
of transition and sheet metal duct and cover gap with a starting collar
wrapped around duct and transition.  Locate collar screws so they fit into
corner of duct cover. Secure collar to transition and duct with three sheet
metal screws each.  Seal with duct tape.
Do not use duct smaller than the transition.
Do not use duct smaller than the transition.
Do not use duct smaller than the transition.
Do not use duct smaller than the transition.
Do not use duct smaller than the transition.
Starting
Collar
1"
13
Figure 4
Figure 4
Figure 4
Figure 4
Figure 4
Figure 5
Figure 5
Figure 5
Figure 5
Figure 5