GE 82-POE Benutzerhandbuch

Seite von 226
Chapter 2: Installation 
18 
GE-DS-82 and 82-PoE Ethernet Managed Switch User Manual 
Step 4: Follow the same steps to attach the second bracket to the opposite side.  
Step 5: After the brackets are attached to the Managed Switch, use suitable screws to 
securely attach the brackets to the rack, as shown in Figure 7. 
Figure 7:  Mounting the GE-DS-82 in a rack 
 
Step 6: Follow steps 4 and 5 of the Desktop Installation section to connect the 
network cabling and supply power to the Managed Switch. 
SFP Transceiver Installation 
This section describes how to insert an SFP transceiver into an SFP slot. 
SFP transceivers are hot pluggable and hot swappable. You can insert and remove a 
transceiver from any SFP port without powering down the Managed Switch, as 
shown in Figure 8.