McCulloch 532 43 21-09 Benutzerhandbuch

Seite von 20
5
UNPACK CARTON & INSTALL HANDLE  
(See Fig. 2)
CAUTION:  Be careful of exposed 
sta ples when handling or disposing 
of cartoning material.
IMPORTANT
WHEN UNPACKING AND AS SEM BLING 
TILLER, BE CAREFUL NOT TO STRETCH OR KINK 
CABLE(S).
•  Cut cable ties securing handle column.
•.  Route cable(s) as shown and slide handle column onto 
handle mount.
•  Remove all packing from carton.
• 
Secure handle column using two (2) carriage bolts and 
two (2) flange locknuts. Tighten se cure ly.
•  Cut away carton.
•  Route tine control cable(s) through plas tic cable clip 
on handle mount.
NOTE: Cables must not touch the muffler.
• 
Cut cable ties securing tiller to skid. Re move tiller from 
skid by pulling backwards. 
•  Remove screws securing depth stake to skid and 
discard the screws.  
dep
th_st
ak
e_4
DEPTH
STAKE
SUPPORT
BOLT
HEX BOLTS,
LOCK WASH ERS,
AND HEX NUTS
DEPTH STAKE
SUPPORT
NUT “A”
ENGINE BRACK ET
HALVES
Fig. 3
STAKE
SPRING
ASSEMBLY
HANDLE HEIGHT
• 
Handle height may be adjusted to better suit operator.  
(See “HANDLE HEIGHT” in the Service and Ad just -
ments section of this manual).
TILLING WIDTH
•  Tilling width may be adjusted to better handle your 
tilling con di tions (See “TINE ARRANGEMENT” in the 
Service and Adjustments section of this manual).
TINE OPERATION
• 
Check tine operation before first use.  (See “TINE OP-
ERATION CHECK” in the Service and Adjustments 
section of this manual). 
INSTALL DEPTH STAKE AS SEM BLY 
(See Fig. 3) 
•  Loosen nut “A”.
•  Insert stake support between engine brack et halves 
with stake spring down. 
•  Bolt stake support to engine brackets with bolts, lock 
washers and nuts. Tight en se curely. Tighten nut “A”.
•  Depth stake must move freely. If it does not, loosen 
support bolt.
Fig. 2
TILLER
HANDLES
CABLE(S)
HANDLE
PANEL
BOLTS