Sterling 882.000254.00 Benutzerhandbuch

Seite von 91
7/50D Plus or 7/50D Controller 
Chapter 3:  Installation 
14 
Chapter 3:  Installation 
3-1 Uncrating 
7-Pump, 50D & D Plus-Station Controllers are shipped mounted on a skid, enclosed in a 
plastic wrapper, and contained in a cardboard box. 
1.  Pry the crating away from the skid. 
Note:  Remove the nails holding the box to the skid and lift the box off 
carefully; avoiding staples in the 1’ x 4’ wood supports.  Cut the steel 
banding. 
2.  Use a pry bar to remove the blocks securing the unit to the skid. 
3.  Lift unit from sides, inserting forklift under the base.  The forks must be equidistant 
from the centerline of the unit and the unit must be balanced on the forks.  Lift 
slowly and only high enough to clear the skid.  Use a pry bar if necessary to 
carefully remove the skid from the unit. 
4.  Lower slowly.   
3-2  Mounting the Control Panel 
Note:  Before you mount the panel, consider how you run wiring to the 
KwikLink connectors, ArmorBlocks, vacuum hoppers, the filter cham-
ber atmospheric valve (if so equipped) and the pump motor starter(s), 
vacuum switch(es), and vent valve(s).  
Mount the control panel on a flat, vertical area. It should be a visible area that gives your 
operator access to the control. The panel requires a low voltage power drop as listed on the 
serial tag. 
3-3 System 
Installation 
Overview 
Installing the 7-pump 50-station controller is easy and straightforward.  Because the system 
uses networked distributed I/O modules, you’ll only need to run two cables for the entire 
system. 
The following is a typical installation sequence: 
1.  Run the black power and the grey data KwikLink™ flat cables from the start of the 
system to the end, attaching them to vacuum tubing with nylon cable ties. 
2.  Set up mounting plates with tubing clamps; install KwikLink™ connectors and 
ArmorBlocks onto mounting plates as required. 
3.  Install KwikLink connectors and ArmorBlock™ cable plates to mounting plates, and 
install on vacuum tubing at each node location, just before a T-fitting or valve. 
4.  Install cable terminations. 
5.  Determine location of network system nodes, and set addresses for ArmorBlocks as 
required. 
6.  Set up and connect to the controller and, if purchased, remote display. Connect grey 
patch cords from controller terminals to KwikLink connectors installed in Step 3.