Sterling SSV-052R Benutzerhandbuch

Seite von 37
XSV-05, XSV-05/R, & XSV-05/2R Single Conveying Units - Venturi Style 
22 of 36 
 
 
 
 
 
 
 
 
 
 
 
5-1 Maintenance 
Intervals 
 
Check the setting of the pressure regulator.   
Empty the water separator. 
Daily: 
Check danger signs on the unit for legibility and completeness. 
Clean the cartridge filter and screen (depending on accumulation of 
dust). 
Blow out the filter from the inside using compressed air. 
Monthly: 
Check the electrical connections for proper functioning. 
Check all electrical and mechanical connections for proper fit. 
Every 6 
months: 
Replace filter and screen (depending on accumulation of dust). 
 
 
 
 
 
Disconnect the equipment from main electrical supply before 
starting maintenance procedures to ensure that it cannot be 
switched on unintentionally.  Depressurize all compressed air 
piping of the equipment before starting maintenance work.
 
 
Please observe the maintenance intervals. 
Before starting maintenance work, clean the equipment of oil, fuel 
or lubricants. 
Ensure that materials and incidentals required for operation as well 
as spare parts are disposed of properly and in an environmentally 
sound manner. 
Use only original manufacturer spare parts. 
Keep record of all maintenance and repair procedures.
 
 
The maintenance intervals provided are average values. 
The maintenance intervals might be shortened due to your 
individual process conditions.