Mitsubishi Electronics -QS90SR2SP-CC Benutzerhandbuch
5
SETTINGS AND PROCEDURES BEFORE
OPERATION
5.1 Q Series Safety Relay Module
5.1.4 Mounting/removal
5
- 6
1
O
V
ER
VI
E
W
2
S
YST
EM
CONF
IGURA
T
ION
3
S
P
E
C
IF
ICA
T
IONS
4
F
UNCT
IO
NS
5
S
E
T
T
INGS
A
ND
PR
O
C
E
DURES
BEF
ORE
OP
E
R
A
T
ION
6
T
R
O
U
BL
ESH
O
O
T
ING
AP
PENDI
X
5.1.4
Mounting/removal
For mounting/removing the Q series safety relay module on/from the base unit, refer to the
QCPU User's Manual (Hardware Design, Maintenance and Inspection) together.
When installing a programmable controller to a control panel or similar, fully consider its
operability, maintainability, and environmental resistance.
QCPU User's Manual (Hardware Design, Maintenance and Inspection) together.
When installing a programmable controller to a control panel or similar, fully consider its
operability, maintainability, and environmental resistance.
(1) Installation position
Keep the clearances shown below between the top/bottom faces of the modules and
the control panel or other parts so that good ventilation is ensured and the modules
can be easily replaced.
the control panel or other parts so that good ventilation is ensured and the modules
can be easily replaced.
* 1: A clearance required when the wiring duct is 50mm or less in height A 40mm or more clearance is
required when the wiring duct is longer.
Figure 5.3 Installation position
*1
Ceiling of the control panel,
wiring duct or any other parts
wiring duct or any other parts
5mm or more
5mm or more
30mm or more
30mm or more
20mm
or more
or more
Programmable
controller
controller
Door
Control
panel
panel