8.4. Mounting onto mixing hoppers with lateral inlet
A material hopper VT 2,3/70/VT2,8/70 is required:
Mount the material hopper onto the swan-neck of the
mixing hopper.
Mount the unit onto the intermediate hopper.
Mount the material hopper onto the swan-neck of the
mixing hopper.
Mount the unit onto the intermediate hopper.
F
Observe the bearing capacity of the machine flange.
8.5. Mounting onto dosing station DT 30
An adapter piece AD 1/5 is required:
Mount the dosing hopper directly onto the dosing container
of the dosing station DT 30.
Mount the unit onto the dosing hopper.
Mount the dosing hopper directly onto the dosing container
of the dosing station DT 30.
Mount the unit onto the dosing hopper.
F
Observe the bearing capacity of the machine flange.
Figure 7: VT 2,3/70/2,8/70
Figure 8: AD 1/5