KatalogInhaltsverzeichnisPreface3Table of Contents4Defining the Dehumidification Challenge5Dedicated OA System Configurations6Comparison of different dedicated OA system configurations7Cold or Neutral Air?9Designing a Dedicated OA System12Selecting the Dedicated OA Unit12Step 1: Determine the entering-air condition.12Step 2: Choose the maximum limit for space humidity.13Step 3: Determine the latent loads in the space.14Step 4: Determine the total airflow that the dedicated outdoor air unit must deliver.15Step 5: Determine which zone requires the driest conditioned outdoor air.15Step 6: Determine the required dew point for the conditioned outdoor air.16Step 7: Determine the supply-air dry-bulb temperature for the dedicated outdoor air handler.16Dehumidification mode18Sensible cooling mode18Sensible heating mode19Ventilation only mode19Control of the Dedicated OA Unit17Dehumidification mode18Sensible cooling mode18Sensible heating mode19Ventilation only mode19References20Größe: 1,2 MBSeiten: 24Language: EnglishHandbuch öffnen