Premier Mounts PVUM Leaflet

Page of 1
 
PP-TL 
 
 
 
Page - 1 - 
Installation Instructions 
 
 
PP-TL INSTALLATION INSTRUCTIONS 
 
WARNING:  For added safety and ease of installation, use a qualified professional to properly install the 
correct mounting accessories. The mounting surface being used must hold the weight 
requirements indicated on your TV mount instruction sheet. If monitor size is greater than 27”, 
model PVUM must be used for added stability.  
NOTE
The lag bolts and washers are used to mount the bracket to the stud through the holes in the back 
of the ceiling plate. It may be easier to mount the plate first, before assembling the entire 
product. Use an 1/8” drill bit to drill pilot holes 1-½” deep. 
 
1.  Set the coupler assembly in place in the center of the ceiling plate. 
2.  Slide the ½” x 3 ½” bolt through the holes in both parts and secure with the ½”-13 Nylock nut. 
3.  Insert the two (2) M8 x 16mm screw and the two (2) ¾” flat washers through the adjusting slots on either 
side of the bracket and then screw them into the holes in the coupler assembly. 
4.  Tighten the screws after determining the proper angle for the coupler. 
5.  Use the M6 x 12mm set screw to secure the connecting pipe. 
6.  Use a pipe wrench to secure all the connections. 
 
 
Figure 1. PP-TL Assembly 
 
Solid Structure 
Mounting 
Points 
Wood Stud 
Mounting 
Points 
M8 x 16mm 
Screw and Star 
Washer 
M6 x 12mm Set 
Screw 
M8 x 16mm 
Screw and Star 
Washer 
½” x 13 Nylock 
Nut
IN-PPTL.R2