Emerson Process Management 2400S User Manual
92
Micro Motion
®
Model 2400S Transmitters for PROFIBUS-DP
Measurement Performance
SENSOR
VERFY/x%
Figure 10-1
Meter verification procedure – ProLink II
Verify configuration
parameters
Tools >
Meter Verification >
Structural Integrity Method
Meter Verification >
Structural Integrity Method
View previous test data
Next
Enter optional test data
Initialize and start meter
verification
Next
Abort
Next
Fault
configuration
Hold last
value
Progress bar shows
test in progress
Next
Finish
(2)
Graph of results
Rerun
test?
Yes
Pass
Fail
No
Start
Back
(1)
View report (option to print
or save)
Back
Abort
(1) If the graph was viewed at the beginning of the procedure,
clicking Back here will return to the beginning of the procedure
(along the dotted line).
(along the dotted line).
(2) The results of the meter verification test are not saved until
Finish is clicked.