Eureka! Tents N!ergy Portable Canopy User Manual

Page of 2
fig.1
B
D
C
fig.3
A
fig.2
fig.4
fig.5
fig.6
fig.9
fig.8
fig.10
fig.13
fig.14
fig.7
fig.12
fig.11
ASSEMBLY INSTRUCTIONS  
N!ERGY PORTABLE CANOPY
Component List: 1 Canopy Top,  1 Frame Assembly,  1 Carry Bag 
w/Wheels,  1 Pre-Installed Wiring Harness w/ Switch,  4 Nailhead 
Stakes,  4 Guy Out Skewers,  4 Attached Guy Out Cords
NOTE: Do not drop carry bag. Do not bounce the bag on its end to get 
the frame out. These actions may damage the electrical components.
Although it is possible to raise this structure by yourself; it is much easier 
and faster if you have help.
Rev  B  4.09
Expand the Frame:
• Open the carry bag, remove the frame and top. Lay the top aside and 
stand the frame up, near its final location
• With one person at 
A and another at B, lift the poles and step back to 
pull the legs out and away from the center. See fig. 1. Move to 
C and D 
and again lift and pull the 
legs out and away. Work 
back and forth between 
AB and CD, until the 
frame is extended as 
shown in fig. 2
• If you are working alone, 
pull the frame apart as 
best you can and then 
drive a nailhead stake 
through the hole in the 
baseplate of one of the 
legs. See fig. 3. Work your 
way from corner, pulling 
out and away from the 
staked leg 
• Continue until the frame  
is extended as shown in  
fig. 2
Raise the Perimeter and 
Roof Rafters:
• At each corner, lift the 
bottom section of the 
perimeter rafter until the 
lock button on the leg 
clicks into its seat in the 
collar. See fig. 4 & 5. Take 
care that the collar truly 
captures the button, 
otherwise the roof will 
slide back down.
• Continue with the rest of 
the perimeter rafters 
until all corners are 
locked in place and the 
roof is extended as 
shown in fig. 6
Secure the Structure to the Ground:
• Drive a nailhead stake through the 
holes in the baseplates at the 
bottom of the legs. See fig. 12 
• Use the skewers to stake 
the guyout cords and 
adjust tension with the 
attached sliders. See fig. 13
Attach the Canopy Top to the Frame:
• Lay the fabric on the ground with the top facing 
up and square to the frame. 
• Grasp the two canopy corners closest to the frame 
and drag them up and over the roof to the frame 
corners on the opposite side. Take care that the 
electrical plugs do not get caught on the frame as 
you tug the canopy 
• At each corner, fit the fabric snug to the frame. 
Align the guy gusset to the top of the frame and 
at a 45˚ angle from the leg. See fig. 7
• Move inside, under the canopy. Wrap each pair of 
Velcro® hook pads from the inside corners of the 
canopy to the loops near the top of the corner 
poles. See fig. 8
• Attach all remaining Velcro® tabs to the perimeter 
and roof rafters. See fig. 9
Raise the Legs:
•  Station one person 
at each leg on one 
side of the frame. 
Lift the legs and 
press the button on 
the black collar to 
release the inside 
section. See fig. 10. 
Allow the inside 
sections to fall to one of the three lock 
points. Make sure that the legs are the 
same height and that they are locked in 
place. See fig.11
• Repeat with the remaining two legs
YOUR  CANOPY IS READY!
green
blue
E! Power System: To use, you will need a power source. Our E! Power Pak™ is sold 
separately. Once connected to power, the control will display “green” at any switch 
that is “ON” and the “ON” socket will glow blue. See fig 14
Take Down: Pull up all stakes. Release the 
canopy’s hook & loop straps and remove 
from the frame. You may leave the wire 
harness in place. Collapse all poles and stow. 
Fold the canopy onto itself, roll up.and stow.
Read the important safety instructions on the 
reverse side.