Eureka! Tents Pine Lodge User Manual

Page of 2
Fan Door
poles
Main 
poles
Roof
poles
Wall
poles
Component List: 
1 Tent Body with Guy Ropes, 3 Main Poles, 6 Roof Poles, 6 Wall Poles, 4 Fan Door Poles, 
1 Carry Bag, 1 Stake Bag/Stakes, 1 Pole Bag
2. 
Assemble the shock corded 
poles and divide according to 
size and shape. Take care; 
make sure that each pole 
section is fully seated into the 
next. Do not allow the 
sections to snap together as 
this can damage the ends. 
See fig 2.
1. 
Remove from the carry bag and separate all the components. Unroll and unfold the 
fabric top side up, on a clean, dry space and open the doors. If windy, stake down the 
windward corner. See fig 1. 
Guy Out: This tent has very large straight walls that act differently in high winds. If there 
are high winds, carefully follow the guy out instructions on the back side of this sheet.
Power Port: Open zipper and run extension cord 
through opening. Close zipper so that it rests 
next to the extension cord. Make sure the 
zipper cover is not twisted or tucked. The cover 
must lay flat against the outside of the tent to 
keep out rain. See fig 15.
Take Down: Remove the poles from the fan door. 
Pull up all stakes. Pull wall poles off of the pins 
and remove poles. Remove roof poles. Collapse 
all poles and stow. Fold the tent onto itself then 
roll up towards the open door and stow.
Options: Floor Saver and Fly/Awning.
Assembly Instructions for 
the Pine Lodge Tent  
YOUR TENT IS READY !
C
B
A
E
F
D
fig 2
fig 1
fig 5
fig 6
fig 7
fig 8
fig 3
fig 13
fig 14
fig 15
fig 12
fig 14
fig 9
fig 10
3. 
Build the roof frame. Inset three black roof poles into the nylon elbows on one of 
the main poles at 
A, B and C. This forms the outer ridge. Move to the opposite side 
and again fit the same three poles into the nylon elbows of a second main pole at 
D
E and F. This forms one half of the roof. See fig 3 and 4.
3. 
Continue with the remaining three roof poles 
and main pole on the opposite side to 
complete the roof assembly. 
    See fig 5.
4. 
Attach the fabric to the roof 
frame. Hook the shockcorded 
J-hooks to the brass rings 
and to the holes in the 
elbows.
Snap the web clips to the poles. It is best to start in the center and work your way out. You 
must do this now because you won’t be able to reach the clips and hooks once the walls 
are raised. See fig 6, 7 and 8.
NOTE: If you intend to install the optional fly/awning, do now. It is far easier to attach the 
fly/awning while the roof is still on the ground.
Installation of the Optional Fly/Awning:
Step I:  Lay the Fly out on the ground in front of the tent, with the awning to the far front.
Step II:  With 2 people, grab the rear corners of the Fly & walk it over the top of the frame 
from front to back.
Step III:  There are 6 frame extensions, 1 each at the ends of the center ridge and eave 
poles front and rear.  See fig 9 positions A,B, D, E, F- position C not visible.  At the rear of 
the Fly, slide the 3 extensions in to the pockets sewn on the Fly (positions A, B, C).  
Repeat this step along the front of the tent at positions D, E & F. [Continue with tent 
set-up at number 5 'Raise the tent'.]
Step IV:  Once the tent is completely set up and staked out, insert the awning poles and 
stake them out.  See fig 11.
NOTE: When properly seated, the small 
spring on the pole will click into place.
5. 
Raise the tent. Start on one side and insert 
gray wall poles into the elbows. Locate the web 
ring/pins attached to the floor of the tent. Insert 
a pin into the base of each pole. See fig 9 & 10. 
Repeat on the other side until the tent is at full 
height and freestanding.
7.
 Assemble the fan door frame. Slide the 
fiberglass fan door poles, rubber end up, into 
the bottom of the door sleeves. Insert pins 
from the web loop into the bottom of these 
poles. See fig 12 & 13. Tuck the door into its 
perimeter envelope. 
There is a web loop on each side of the fan 
door, stake these down.
8
. Attach the splash guard. To provide an 
extra layer of protection, there is a flap that 
runs across the bottom near the inside of 
the door. Attach the J-hooks from this flap to 
loops at the front corners. See fig 14.
6.
 Stake the tent down. Stake 
out the corner rings first. As 
you work your way around the 
tent apply tension to square 
the tent and pull out any floor 
wrinkles. Align the center 
poles with the corners and 
stake out web side rings. See 
fig 12. [If you have the 
Fly/Awning option, now 
complete 'Step IV'.]
Important: Make sure the 
bottom front of the tent is in a 
straight line, from corner to 
corner. 
Rev.D  4.09
D
A
B
E
F
fig 11