3com DUA1800-0AAA04 User Manual

Page of 119
DUA1800-0AAA04
LinkBuilder MSH Modules
3-17
Choosing Slots For Modules
All slots in the MSH chassis have the same functionality and 
therefore you are not restricted as to where in the chassis you 
place Ethernet and Token Ring modules. However, we make the 
following recommendations for practicality and easy 
management of the chassis:
Group all Ethernet modules together and all token ring modules 
together.
Group any ECS modules together and connect to Bus E1(Buses E2 
and E3 can be used but will not provide full statistics gathering).
Insert the management module into slot 11 of the chassis.
This configuration facilitates administration and network 
monitoring.
 ECS modules must be installed in slots 1 to 10 only.
There are constraints to the positions of FDDI modules relative to 
one other. These are detailed in the user guide which 
accompanies the RingBuilder module. There are no constraints on 
the position of FDDI modules or groups relative to Ethernet and 
Token Ring modules
LinkBuilder MSH Modules
Please note that this section covers the common installation and 
removal instructions for MSH modules. For installation and 
removal details specific to each module, please refer to the User 
Guide that accompanies the product.
 The modules are designed to be hot inserted into the MSH 
chassis; you do not need to power down the unit before installing 
or replacing them.
Chassis.bk : CHAPTER3  Page 17  Monday, February 10, 1997  1:11 PM