Sonic Alert 705 User Manual
March 2001
Page 63
AOC-14 ETOPS - Extended Range Operations
7.
Do part pooling activities consider
ETOPS CMP requirements?
ETOPS CMP requirements?
Ref: TP 6327 4.11
N/A
OK
Finding
Not Checked
8.
Does the aircraft configuration and
modification status conform to the
requirements specified in the CMP
document? (sample, component
changes)
modification status conform to the
requirements specified in the CMP
document? (sample, component
changes)
Ref:
N/A
OK
Finding
Not Checked
9.
Is there any evidence to suggest
that the operator has conducted a
verification process after engine
shutdown or primary system
failure or critical maintenance
activities? (sample)
that the operator has conducted a
verification process after engine
shutdown or primary system
failure or critical maintenance
activities? (sample)
Ref: TP 6327 4.6
N/A
OK
Finding
Not Checked
10.
Does the operator continue to
input unscheduled / scheduled
engine removal data into the
ETOPS program?
input unscheduled / scheduled
engine removal data into the
ETOPS program?
Ref: TP 6327 4.9.2
N/A
OK
Finding
Not Checked
11.
Are thrust reductions due to
abnormal causes logged and
tracked for program input?
abnormal causes logged and
tracked for program input?
Ref:
N/A
OK
Finding
Not Checked
12.
Does the operator adhere to the
approved reliability program and
are ETOPS sensitive items
covered by the program, i.e.
propulsion, systems, structure?
approved reliability program and
are ETOPS sensitive items
covered by the program, i.e.
propulsion, systems, structure?
Ref:
N/A
OK
Finding
Not Checked