ADC AD-115ES User Manual

Page of 50
113202 - 10
www.amdry.com
9
IMPORTANT: Dryer must be installed in a location/environment in which the ambient
temperature remains between 40° F (4.44° C) and 130° F (54.44° C).
B.  UNPACKING AND SETTING UP
Remove protective shipping material (i.e., plastic wrap and optional shipping box) from dryer.
IMPORTANT: Dryer must be transported and handled in an upright position at ALL times.
The dryer can be moved to its final location while still attached to the skid or with the skid removed.  To unskid the
dryer, locate and remove the four (4) lag bolts securing the base of the dryer to the wooden skid.  One (1) is
located at the rear base (remove the back panel for access), and two (2) are located in the bottom of the lint
chamber.  To remove the two (2) lag bolts located in the lint chamber area, remove the lint drawer and the two (2)
Phillips head screws securing the lint door in place.
1. Leveling Dryer
To level dryer, place 4-inch (10.16 cm) square metal shims (refer to the illustration above) or other
suitable material under the base pads.  It is suggested that the dryer be tilted slightly to the rear.