Sterling 882.00290.00 User Manual

Page of 53
Chapter 5:  Maintenance 
5-1  Preventative Maintenance Schedule 
The checklist below contains a list of items which should be inspected and/or replaced to 
keep your Portable Drying/Conveying System operating at peak efficiency.  Perform each 
inspection at the regular intervals listed below. 
System model # 
 
Serial # 
Every Day 
Date/ 
By 
Date/ 
By 
Date/ 
By 
Date/ 
By 
Date/ 
By 
Date/ 
By 
Date/ 
By 
Date/ 
By 
Date/ 
By 
Date/ 
By 
Date/ 
By 
Date/ 
By 
Date/
By 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Inspect all filters for 
wear, replace/clean 
if dirty or worn. 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Every week 
Date/ 
By 
Date/ 
By 
Date/ 
By 
Date/ 
By 
Date/ 
By 
Date/ 
By 
Date/ 
By 
Date/ 
By 
Date/ 
By 
Date/ 
By 
Date/ 
By 
Date/ 
By 
Date/
By 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Check to make 
sure that all hose 
connections are 
air tight.         
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Every month  Jan  Feb  Mar  Apr  May Jun
Jul  Aug Sep  Oct  Nov Dec
Lock out electrical 
power and inspect 
electrical wiring for 
integrity. 
 
 
 
 
 
 
 
 
 
 
 
 
Lock out electrical 
power and check 
heater elements for 
continuity using an 
ohmmeter. 
 
 
 
 
 
 
 
 
 
 
 
 
Check dew point 
and temperature 
tracking with an 
external dew point 
monitor and 
pyrometer. 
 
 
 
 
 
 
 
 
 
 
 
 
Visually inspect the 
shifting of the 
airflow valve during 
one cycle. 
 
 
 
 
 
 
 
 
 
 
 
 
 
Every year 
Next scheduled 
inspection 
Actual inspection 
Date/By 
Next scheduled 
inspection 
Actual inspection 
Date/By 
Inspect desiccant. Replace 
if brown or broken. 
 
 
 
 
 
Every two years 
Scheduled  
replacement date 
Actual replacement 
Date/Work done by 
Scheduled 
replacement date 
Actual replacement 
Date/Work done by 
Replace desiccant. 
 
 
 
 
 
 
 
 
- Photocopy this page for your maintenance records - 
Dehumidifying Dryers 
Chapter 5: Maintenance 
34 of 53