Husqvarna TE 125 EU User Manual

Page of 128
12 SERVICE WORK ON THE CHASSIS
49
» If detent positions are noticeable:
– Adjust the play of the steering head bearing.
x
– Check the steering head bearing and change if necessary.
Finishing work
– Remove the motorcycle from the lift stand. ( p. 43)
12.14
Adjusting the play of the steering head bearing
x
Preparatory work
– Raise the motorcycle with the lift stand. ( p. 43)
L01629-10
Main work
– Loosen screws
1
. Remove screw
2
.
– Loosen and retighten screw
3
.
Guideline
Screw, top steering head
M20x1.5
12 Nm (8.9 lbf ft)
– Using a plastic hammer, tap lightly on the upper triple clamp to avoid strains.
– Tighten screws
1
.
Guideline
Screw, top triple clamp
M8
17 Nm (12.5 lbf ft)
– Mount and tighten screw
2
.
Guideline
Screw, top steering stem
M8
17 Nm
(12.5 lbf ft)
Loctite
®
243™
Finishing work
– Check the play of the steering head bearing. ( p. 48)
– Remove the motorcycle from the lift stand. ( p. 43)
12.15
Greasing the steering head bearing
x
800010-10
– Remove the lower triple clamp.
x
– Install the lower triple clamp.
12.16
Removing the front fender
Preparatory work
– Switch off all power consumers and switch off the engine.
– Remove the headlight mask with the headlight. ( p. 82)
C00596-10
Main work
– Disconnect plug-in connectors
1
of the turn signals.
– Remove screws
2
.
– Take the brake line and wiring harness out of the brake line guide.