Husqvarna TE 125 EU User Manual

Page of 128
16 COOLING SYSTEM
88
L01653-11
(TE 250/300)
– Remove screw
1
. Take off radiator cap
2
.
– Completely drain the coolant.
– Mount and tighten screw
1
with a new seal ring.
Guideline
Drain plug, water pump cover
M10x1
15 Nm
(11.1 lbf ft)
16.5
Refilling with coolant
x
Warning
Danger of poisoning Coolant is poisonous and a health hazard.
– Coolant must not come into contact with the skin, eyes, or clothing. If contact occurs with the eyes, rinse with water imme-
diately and contact a physician. Immediately clean contaminated areas on the skin with soap and water. If coolant is swal-
lowed, contact a physician immediately. Change clothing that is contaminated with coolant. Keep coolant out of reach of chil-
dren.
L01709-10
(TE 125)
– Make sure that screw
1
is tightened.
– Position the motorcycle upright.
– Fill the radiator completely with coolant.
Coolant
1.2 l (1.3 qt.)
Coolant (
Coolant (mixed ready to use)
L01707-10
– Loosen screw
2
until coolant that does not contain any bubbles escapes.
Replace and retighten screw
2
.
Guideline
Bleeder screw, cylinder head
M6
10 Nm (7.4 lbf ft)
L01654-10
(TE 250/300)
– Make sure that screw
1
is tightened.
– Position the motorcycle upright.
– Fill the radiator completely with coolant.
Coolant
1.2 l (1.3 qt.)
Coolant (
Coolant (mixed ready to use)
400677-10
– Position the vehicle as shown and secure it against rolling away. A height differ-
ence of
A
must be reached.
Guideline
Height difference
A
75 cm (29.5 in)
Info
To ensure that all of the air can escape from the cooling system, the front
of the vehicle must be jacked up. A poorly bled cooling system is less
effective at cooling and may result in overheating of the engine.