Avaya 03-300430 User Manual

Page of 2574
Communication Manager Maintenance-Object Repair Procedures
1070 Maintenance Procedures for Avaya Communication Manager 3.0, Media Gateways and Servers
 
Figure 53: Far-End Internal Loop-Back Test (#797)
Table 365: Test #797 Far-End Internal Loop-Back Test 
Error 
Code
Test 
Result
Description / Recommendation
2000
ABRT
Timed out while waiting for a response from the circuit pack.
1. Retry the command at 1-minute intervals up to 3 times.
2100
ABRT
Could not allocate the necessary system resources to run this test.
1. Retry the command at 1-minute intervals up to 3 times.
2300
ABRT
The downlink message necessary to run this test could not be sent.
1. Retry the command at 1-minute intervals up to 3 times.
2301
ABRT
The timer could not be set before sending the downlink message 
necessary to run this test.
1. Retry the command at 1-minute intervals up to 3 times.
2316
ABRT
Fiber link is not administered. 
Use add fiber-link to administer the DS1 converter.
2321
ABRT
DS1 facility is not busied out. 
Use busyout ds1-facility to busyout the DS1 facility. 
If there is only one DS1 facility, use busyout board to busyout the 
DS1 converter circuit pack.
2332
ABRT
For this system configuration, test is not allowed to execute at the far end 
when there is only one DS1 facility available. 
1. Execute the test at the other end of the DS1 converter complex.
 1 of 2
DS1 Facility
DS1CONV
A
.
.
.
.
.
.
.
.
.
.
.
.
. . .
Loop at internal interface
for the DS1 facility
DS1CONV
B
CSU
B
Test starts here
CSU
A