Avaya 03-300430 User Manual

Page of 2574
Communication Manager Maintenance-Object Repair Procedures
1180 Maintenance Procedures for Avaya Communication Manager 3.0, Media Gateways and Servers
 
Figure 64: Center Stage Switch Configuration with Duplicated PNC
In a duplicated center stage switch configuration, two EIs are needed in each PN. One resides 
in the PNC’s A side and one in the B side. Note that a PNC designation (A or B) does not 
directly designate the carrier where an EI resides. The active PNC’s EI is the one acting as the 
PN’s Archangel (TDM bus master). This EI’s amber LED should be blinking at a rate of 
2 seconds on and 200 ms off. Whereas, the amber LED on standby PNC’s EI should be off.
A PN (and thus, the EIs contained within it) can be remoted via a DS1 Converter complex. This 
requires that a fiber link (providing connectivity to the remoted PN) be administered with an 
associated DS1 Converter complex. This complex consists of two TN574 DS1 Converter 
(DS1C-BD) circuit packs connected by from 1 to 4 DS1 facilities. 
on page 1181 shows where the DS1 converter complex fits into an 
EI-to-SNI or EI-to-EI fiber link. For more information, see 
FIBER
FIBER
A-PNC
FIBER
FIBER 
FIBER
21
21
10
1 1
1 2 
10
13
13 1 
10 
12
N N
N
N N 
N
N
I I 
I I 
I
I
I
I
I
C C
C C
CARRIER D
SN #1
SN #1
CAB 1
CAB 1
CARRIER D
Slot #
Slot #
EPN EPN
CAB 2
CAB 2
CARRIER B
CARRIER B
CARRIER A 
CARRIER A
CAB 3
CAB 3
Slot #
Slot #
SN #2
SN #2
CAB 2
CAB 2
CARRIER E
CARRIER E
E
E
E
E
E
E
I
I I
I
I
S S 
S S 
S
S S
S
S S 
S
S
N N 
N N 
N
1
2
2
2 10
13
13 2 
1
20
20
B-PNC
METALLIC
METALLIC
CABLE
CABLE
FIBER