Avaya 03-300430 User Manual

Page of 2574
MET-LINE (MET Line)
Issue 1 June 2005
1573
 
2000
ABRT
Response to the test request was not received within the allowable time 
period.
1. Retry the command at 1-minute intervals up to 5 times.
2012
ABRT
Internal system error.
2103
ABRT
The system could not make the conference connection for the test.
1. Retry the command at 1-minute intervals up to 5 times.
7
FAIL
The conference circuit test failed. The conference circuit test is 
performed only if the hybrid test passes. The conference circuit test 
verifies that the network processing element (NPE) can correctly 
conference several test tones together. The test is executed in two parts. 
The first half of the test verifies the operation of the NPE's first three 
conference channels, while the second half verifies the NPE's remaining 
four conference channels. The test puts the NPE in loop around mode 
and instructs it to talk on a specified time slot while listening to a 1004-Hz 
tone, using the conference channels. A GPTD then measures the signal 
and noise levels of the conferenced output and reports whether or not 
these are within an acceptable range. The failure may be due to 
off-board circumstances, the most common of which is an off-hook 
occurring during the test. It is possible that the port may still be functional 
from a user's point of view. Also, check the error logs against the 
GPTD-BD, the TONE-BD, and the TONE-PT.
1. This error can be caused by a disconnected terminal. First, ensure 
that the terminal is connected and the wiring is OK.
2. Then, enter display port and status station to determine 
whether the station is idle. If so, enter test port for this port.
3. If test continues to fail, enter busyout port and release port
and retest the port.
Table 581: Test #57 Hybrid Circuit and Conference Circuit Test  (continued)
Error
Code
Test
Result
Description / Recommendation
 2 of 3