Avaya 03-300430 User Manual

Page of 2574
Communication Manager Maintenance-Object Repair Procedures
1844 Maintenance Procedures for Avaya Communication Manager 3.0, Media Gateways and Servers
 
System Technician-Demanded Tests:
Descriptions and Error Codes
Investigate tests in the order presented below. Clearing Error Codes associated with the one 
test may also clear errors generated from other tests in the sequence.
Link Tear Down Test (#213)
This test is destructive.
This test disconnects the existing link between the system and the external PMS device. If the 
link has been disconnected already, then this test just returns “PASS.” Every resource allocated 
for a PMS Link is released after this test.
Order of Investigation
Short Test 
Sequence
Long Test 
Sequence
D/ND
Link Tear Down test (#213)
X
Destructive
Link Retry test (#215)
X
X
Nondestructive
Table 676: Test #213 Link Tear Down Test 
Error
Code
Test
Result
Description / Recommendation
40
50
ABRT
Internal system error.
1. Retry the command at 1-minute intervals up to 5 times.
1010
ABRT
The PMS Link has been busied out and placed in the out-of-service state.
1. Enter release pms-link to release the PMS Link from busyout 
state.
2. Retry test pms-link long to execute the test.
2012
ABRT
Internal system error.
1. Retry the command at 1-minute intervals up to 5 times.
FAIL
Internal system error.
1. Retry the command at 1-minute intervals up to 5 times.
PASS
The PMS Link is torn down.