Avaya 03-300430 User Manual

Page of 2574
Communication Manager Maintenance-Object Repair Procedures
2250 Maintenance Procedures for Avaya Communication Manager 3.0, Media Gateways and Servers
 
Control Channel Test (#296)
This tests the integrity of the Control Channel bus by ensuring that communication through the 
TDM bus is operational. The test attempts to query a circuit pack whose presence is required in 
each port network for proper operation (Tone-Clock or Tone Detector). If a reply from the 
queried circuit pack is received, the TDM bus is considered operational and the test passes. If 
no reply is received, the Bus is not operational and the test fails.
Table 803: Test #296 Control Channel Test 
Error
Code
Test
Result
Description / Recommendation
Any
other
than
1005
ABRT
Internal system error.
1. Retry the command at 1-minute intervals up to 3 times.
1005
ABRT
Since this test is valid only on the control channel bus, it aborts execution 
when run on the non-control channel bus. This is a valid response. Use 
status port-network to verify which bus is the control channel bus.
None
FAIL
Communication through the Control Channel is not working. The problem 
is not necessarily the TDM bus itself.
1. Display the hardware error and alarm log for the Tone-Clock circuit and 
for the Tone Detector circuit in the port network where the faulted TDM 
bus resides. See 
2. Resolve the errors and alarms for the Tone-Clock and Tone Detector 
circuits.
3. Display the hardware error and alarm log and look for errors and 
alarms for the active Expansion Interface circuit pack. Se
on page 1176 and resolve its errors.
4. Execute test tdm P command.
5. If the test still fails, see 
PASS
Communication through the control channel bus is operational.